How should modifications to in-cabinet components or programs resulting from project changes be handled?

Release time:

2026-11-11

Author:

Source:


Abstract

Assess the impact of changes on cost, delivery schedules, and work already completed; execute only after a written change order has been issued. For wiring, hole‑making, or program segments that have already been finished, if rework is required due to the change, the party initiating the change must approve both the rework costs and any extension of the project timeline. Verbal changes should not be implemented directly in production.
 

Recommended Reading


Chengyuan Electric and Siemens join forces to create a better future!


On October 23, 2024, at 2:00 PM, Chengyuan Electric successfully held a project communication and technical sharing meeting with Siemens in the first-floor exhibition hall of the factory. The purpose of this meeting was to strengthen cooperation and communication between both parties, promote innovation, and jointly advance the development of the smart electrical field.

2024-10-29

How to choose suitable box-type substations and cable branch boxes


In the power system, box substations and cable branch boxes play a crucial role and are widely used in various settings, such as industrial parks, residential areas, and commercial buildings. However, faced with a variety of models and specifications available in the market, how can one choose the box substation and cable branch box that best meet their needs?

2023-12-25

The role of cable junction boxes in automated control systems.


The cable branching box is one of the indispensable components in an automation control system, playing an important role in the system by enabling the branching and connection of cables, ensuring the normal operation of the entire system. This article introduces the function of the cable branching box and its significance in automation control systems.

2023-12-15