Announcement of the Environmental Impact Assessment Change for the Construction Project of Box-type Substation and High/Low Voltage Complete Switchgear by Hunan Chengyuan Electric Co., Ltd.

Release time:

2016-10-21

Author:

Source:


Abstract

According to the relevant provisions of the "Environmental Impact Assessment Law of the People's Republic of China" and the "Interim Measures for Public Participation in Environmental Impact Assessment" (National Environmental Protection Administration Document No. 2006[28]), the relevant information regarding the "Construction Project of Box-type Substation and High and Low Voltage Complete Switchgear of Changsha Chengyuan Electric Appliance Complete Co., Ltd." is now provided.

According to the relevant provisions of the Environmental Impact Assessment Law of the People's Republic of China and the Interim Measures for Public Participation in Environmental Impact Assessment (State Environmental Protection Administration Circular 2006 [28]), the following announcement is made regarding the "Construction Project of Box-type Substation and Complete Set of High and Low Voltage Switchgear by Changsha Chengyuan Electric Appliance Co., Ltd."

1. Project Name and Overview:

Project Name: Construction Project of Box-type Substation and Complete Set of High and Low Voltage Switchgear by Changsha Chengyuan Electric Appliance Co., Ltd.

Project Overview: The new box-type substation and complete set of high and low voltage switchgear construction project by Changsha Chengyuan Electric Appliance Co., Ltd. had its environmental impact assessment report prepared by the former Changsha Environmental Science Research Institute in December 2007 - "Environmental Impact Report for the Construction Project of New Box-type Substation and Complete Set of High and Low Voltage Switchgear." The Liuyang City Environmental Protection Bureau granted environmental approval for the project on July 4, 2008, with document number Liuhuanfu [2008] No. 44. The project has passed acceptance by the Liuyang City Environmental Protection Bureau. Currently, the main works, auxiliary works, public works, office living facilities, and environmental protection works of the project have all been completed.

In the actual operation process of the new box-type substation and complete set of high and low voltage switchgear construction project by Changsha Chengyuan Electric Appliance Co., Ltd., in order to improve the surface treatment quality of products, ensure product competitiveness, and reduce production costs, a degreasing phosphating process (originally outsourced) has been added during the production process while maintaining the original production scale, product plan, land area, and overall layout basically unchanged.

2. Pollution Prevention Measures and Environmental Impact Analysis

1. Pollution Prevention Measures and Environmental Impact Analysis

Wastewater: The newly added water pollutant from the project is degreasing phosphating wastewater, approximately 5m3/d. The degreasing phosphating wastewater is treated using chemical coagulation + sedimentation + filtration methods. According to monitoring results, all major pollutant indicators can achieve standard discharge.

The water quality discharged from the project meets the acceptance standards of sewage treatment plants, with a small amount of wastewater discharge that will not impact the water quality or quantity at sewage treatment plants. After further treatment at Yong'an Sewage Treatment Plant, it will also not have a significant impact on regional surface water environmental quality.

Exhaust Gas: The project has taken measures to improve the industrial sulfuric acid addition method to avoid generating sulfuric acid mist, thus not adding new atmospheric pollution sources and having no significant impact on regional air quality.

Noise: The project uses low-noise equipment and does not add high-noise equipment, which has no significant impact on regional sound environment.

Solid Waste: The newly added solid waste from the project mainly includes sludge from wastewater treatment stations, phosphating and de-oiling rust removal waste residue, waste packaging barrels, and packaging bags. Sludge from phosphating wastewater treatment stations and phosphating and de-oiling waste residue are classified as hazardous waste and will be entrusted to a qualified hazardous waste disposal company (Hunan Shengheng Environmental Protection Fire Technology Co., Ltd.) for collection and disposal. Waste packaging barrels will be recycled by manufacturers, which will not impact the regional environment.

3. Overall Conclusion of Environmental Impact Assessment

The construction project complies with relevant planning, has a reasonable site selection, and overall feasible environmental protection measures that meet environmental protection requirements. From an environmental protection perspective, this project's construction is feasible.

4. Main Matters for Public Opinion Solicitation

1. Are you satisfied with the current state of regional environmental quality?

2. Are you aware of or understand this project's situation?

3. How did you learn about this project's information?

4. What do you think are the harms (impacts) to local environmental quality after this project's implementation?

5. What is your attitude towards this project and what suggestions or requirements do you have regarding its implementation in terms of environmental protection?

5. Public Opinion Feedback Method

Within 10 working days from the date of announcement, you can provide relevant opinions through the following contact methods; if needed, you can request the environmental impact assessment documents for this project from the evaluation unit. After confirming that you are a relevant responsible person for this project, we will provide you with relevant texts.

Construction Unit: Changsha Chengyuan Electric Appliance Co., Ltd.

Contact Person: Chen Anyi Contact Phone: 18874884215

Mailing Address: No.13 Yongyang Road, Manufacturing Industrial Park, Yong'an Town, Liuyang City

Evaluation Unit: Hunan Meijing Environmental Protection Technology Consulting Service Co., Ltd.

Contact Person: Engineer Zhang Contact Phone: 073184227890

Mailing Address: No.35 Ziwei Road, Furong District, Changsha City
 

Changsha Chengyuan Electric Appliance Co., Ltd.
October 21, 2016

Recommended Reading


Chengyuan Electric and Siemens join forces to create a better future!


On October 23, 2024, at 2:00 PM, Chengyuan Electric successfully held a project communication and technical sharing meeting with Siemens in the first-floor exhibition hall of the factory. The purpose of this meeting was to strengthen cooperation and communication between both parties, promote innovation, and jointly advance the development of the smart electrical field.

2024-10-29

How to choose suitable box-type substations and cable branch boxes


In the power system, box substations and cable branch boxes play a crucial role and are widely used in various settings, such as industrial parks, residential areas, and commercial buildings. However, faced with a variety of models and specifications available in the market, how can one choose the box substation and cable branch box that best meet their needs?

2023-12-25

The role of cable junction boxes in automated control systems.


The cable branching box is one of the indispensable components in an automation control system, playing an important role in the system by enabling the branching and connection of cables, ensuring the normal operation of the entire system. This article introduces the function of the cable branching box and its significance in automation control systems.

2023-12-15